Steel Heart Machine and Fab. Inc. - Welding, Fabrication, Machining
RSS Become a Fan

Recent Posts

Louvers
Stairs
Grid Gates
Cable rail
Update Web Site

Categories

2013
2014
2015
new web site
powered by

My Blog

Railing


This is a railing that whent out to be powder coated last week.
All Alum. The post are 2 x 2 Square the tubes are 1/2 Schedule 40 and the inside where the tubes connect are 1/2 X 1 they are drilled on a mill with a 3 axes digital read out so the holes are exact. The holes are drilled threw the 1/2 x 1 then plug welded and ground flat so you dont see any weld.


1 Comment to Railing :

Comments RSS
Steven Dumeny on Saturday, December 21, 2013 6:14 PM
Merry Christmas and have a happy new year buddy from Ohio. I'm doing well and hope you are doing well too. God Bless Steve. (Hope you still remember me?)
Reply to comment

Add a Comment

Your Name:
Email Address: (Required)
Website:
Comment:
Make your text bigger, bold, italic and more with HTML tags. We'll show you how.
Post Comment
Website Builder provided by  Vistaprint